Friday, March 27, 2009

Networking

Early this week for 2 days i re-arrange our 24 port switch.. basically i remove the old hub from the rack and put in the new switch, that was on the 5th floor... only problem was the power supply coz the cable is not long, i have to do some electrician job hahahha lucky i know a thing or two bout extension wired and how to re-assemble it. After that was finish i went to 3rd floor where another 2 hubs waiting for me, looking at the cable is like ~sigh~... make story short here are some of the pic i took on the 3rd floor while doing my work, last time i write so much i wife would say "punya banyak ko taip" (WAH u blog so many) but when she ask me do her work why you say didnt know how to do writting hahahaha that was different mah!
Our old cabling with the old 10 base Hub
look at those cable
job finish!
2 old 12 port hub
New 24 port Switch

After everything was finish, seems i need 1 more port hahaha 12 x 2 = 24 so should be enough but it seems the old Hubs uplink is at the back so i unplug 1 cable that dont have any activity, now got people complain 3 times already.. so i just unplug a cable with no activity and plug theirs. Gonna unplug 1 cable at our place later so that all can internet! ~Desu

2 comments:

  1. 1. ada label kah?
    2. hub yg lama simpan sbg backup

    ReplyDelete
  2. 1. some got label some not, maybe 1-2 day mau spend my time do that
    2. Hub lama mmg kena simpan la or JPKN mo? hhehhe

    ReplyDelete